Provided all works out with the property in the New Year, this is what I have planned for the 100thgallery fit out. The kitchenette is already there, so all I need to do in January is –

–          have the concrete floor polished

–          build three interior walls

–          install the hanging system

–          install gallery lighting

–          paint the whole space

–          put 100thgallery on the window

–          hang some art

–          have a grand opening

Too much for one month?   Almost certainly, but let’s give it a go!

PS. Each room below is 5m across x 3m deep.

proposed floorplan